The surface roughness to be applied should be removed.
The corners of the column should be rounded for a
smooth transition.
Gaps should be repaired with
high-strength
repair mortar.
PRIMER PROCESS
Before proceeding with the priming process, the components should be mixed at the appropriate rate and applied to each cm2 surface of the column, which was previously roughened and repaired.

BONDING PROCESS

After the appropriate component mixture is made by expert teams on the surface of which the primer has dried before, the bonding resin is applied to the column surface and the fabric is adhered
FABRIC WRAPPING PROCESS
After the m2/kg appropriate bonding resin is applied to the column surface, the mortar should be adhered to the column by the expert teams of the fabric according to the appropriate overlap and hugging zones before the mortar hardens.

SANDBLASTING PROCESS